-Supply hot section parts of gas turbine especially for V94.2, GEF5, GEF6, GEF9 models.
-construction managing and reverse engineering of particular parts of turbine.
-supply of spare parts of power plant including turbine parts and high tech parts.
-Mechanical equipment and measuring instrumentation oil & gas & petrochemical section
Cooling systems
Creating a cooling system for turbine air intake is one of the most important ways to increase the power generation of existing power plants. Economically recovered capital for increased turbines output in compared with the investments made for building cooling systems, it is practically insignificants.in this regards initial negotiations with several European companies took place and PED co being able to provide the right solutions at the lowest costs, the possibility of technology transfer to Iran for supporting domestic productions and in some cases it is also possible to create project financing in accordance with certain criteria.